Search
Search results on southwark.gov.uk
-
NSP Site Allocations Methodology Report
Adobe Portable Document Format : 25.1MB https://www.southwark.gov.uk/assets/attach/47974/site-allocations-methodology-report-may-2021-reduced.pdfedge) for redevelopment of Planning the site to provide a part 7/part 4 storey building, a 5 storey...of a part 3, part 5 and part 6 storey building fronting Denmark Hill; - the addition of a 2 storey...3, part 4 and part 8 storey building fronting Daneville Road; - the erection of a new 6 storey building...
-
Site Allocations Methodology Report (May 2021) [EIP82b]
Adobe Portable Document Format : 25.1MB https://www.southwark.gov.uk/assets/attach/42341/EIP82b-Site-Allocations-Methodology-Report-May-2021-reduced.pdfedge) for redevelopment of Planning the site to provide a part 7/part 4 storey building, a 5 storey...of a part 3, part 5 and part 6 storey building fronting Denmark Hill; - the addition of a 2 storey...3, part 4 and part 8 storey building fronting Daneville Road; - the erection of a new 6 storey building...
-
Annual report on delivery of the Transport Plan 2011 (2013/14)
Adobe Portable Document Format : 3.2MB https://www.southwark.gov.uk/assets/attach/9426/southwark-annual-report-on-delivery-of-the-transport-plan-2011-2013-14-.pdfThe surveys of the most recent survey are shown in Table 2....than the Health Survey for England....Table 55: Walking mode share target Increase the w alking mode share in Southw ark to a third (33% )...
-
Local transparency November 2013
Comma-Seperated Values : 53KB https://www.southwark.gov.uk/assets/attach/3319/Local_Transparency_Nov_2013___for_publication___CSV.csvSTATTERS ASSOCIATES,"1,900.00"NATIONAL WESTMINSTER BANK PLC (EBS),"1,900.64"KEHR & TUCKER,"1,920.00"STUART...COUNTY COUNCIL,"3,354.00"AWORTH LAND SURVEYS LTD,"3,360.00"FAMILYPLACEMENT.COM LTD,"3,364.00"ANDREW...6,059.41"RED LION SCAFFOLDING,"6,084.81"LAMBETH CHINESE COMMUNITY ASSOCIATION,"6,087.62"HOLLOW ON THE SQUARE...
-
Local transparency November 2010
Comma-Seperated Values : 68KB https://www.southwark.gov.uk/assets/attach/3387/Local_Transparency_November_2010___CSV.csv(UK) LTD,"1,040.34",,,,,,LONDON ACCIDENT PREVENTION COUNCIL,"1,042.59",,,,,,H S A.,"1,045.16",,,,,,STUART...SQUARE AFTERSCHOOL,"1,292.00",,,,,,VACANT PROPERTY SECURITY LTD,"1,297.50",,,,,,CHURCH.CO.UK COMMUNITY...PAIN WASTE MANAGEMENT LTD,"2,669.00",,,,,,CROYDON COUNCIL,"2,675.25",,,,,,SQUIRES CATERING,"2,687.50"...
-
AMR 2009-10
Adobe Portable Document Format : 1.4MB https://www.southwark.gov.uk/assets/attach/6898/submitted-southwark-amr-09-10.pdfThe information contained in this document helps us to make sure our planning policies are kept up to...We need to make sure we continue to monitor and review our section 106 requirements to make sure that...We need to continue to make sure that through our local development framework planning documents and...
-
final report
Adobe Portable Document Format : 32.3MB https://www.southwark.gov.uk/assets/attach/5769/olbaw_feasibilitystudy_issue_2.0b_-redacted-_v2.pdfAreas not included as part of this survey are listed below: - All areas of flat roof, - All lanterns...We had sight of part of an asbestos survey undertaken by Invicta Analytical Services Ltd dated 21st...former library is a two storey property comprising solid constructed walls with part render to the...
-
Infrastructure Plan (May 2017) [SP203]
Adobe Portable Document Format : 747KB https://www.southwark.gov.uk/assets/attach/11222/sp203-southwark-infrastructure-plan-2017-.pdfPark, strategy (2014) £2M (to 2019) £36M Unfunded 2020- Burgess Park and Southwark Park 2035 tbc....Grant funding was provided to develop Sure Start Children’s Centres borough wide to provide a universal...Southwark has already invested in improving the quality of Early Years buildings using the Sure Start...
-
Infrastructure plan (May 2017)
Adobe Portable Document Format : 747KB https://www.southwark.gov.uk/assets/attach/3757/infrastructure-plan-may-2017-.pdfPark, strategy (2014) £2M (to 2019) £36M Unfunded 2020- Burgess Park and Southwark Park 2035 tbc....Grant funding was provided to develop Sure Start Children’s Centres borough wide to provide a universal...Southwark has already invested in improving the quality of Early Years buildings using the Sure Start...
-
Camberwell Green conservation area appraisal
Adobe Portable Document Format : 2.9MB https://www.southwark.gov.uk/assets/attach/2172/100621_camberwell_green_appraisal_compressed.pdfIt was eventually abolished in 1855 and the site was handed over to the Vestry to make sure that the...three blocks at Nos. 37-43, 45-57 and 59-61 are to the same design of arched first floor windows and square..., when London Plane trees were first cultivated and introduced into the planting design of public squares...