Search
Search results for documents on southwark.gov.uk
-
LBS-1100-23 footings for edge restraints (c'way edge channel)
Adobe Portable Document Format : 184KB https://www.southwark.gov.uk/assets/attach/9608/lbs-1100-23-footings-for-edge-restraints-c-way-edge-channel.pdfLBS-1100-23 footings for edge restraints (c'way edge channel)...Lay as Cl. 1113AR in F/way ▼ CC37 or C25/30....See SSDM/SER Surfacing Materials Palette for permitted C/way Y ▼ 7....
-
LBS-1100-24 footings for edge restraints (c'way edge channel)
Adobe Portable Document Format : 186KB https://www.southwark.gov.uk/assets/attach/9609/lbs-1100-24-footings-for-edge-restraints-c-way-edge-channel.pdfLBS-1100-24 footings for edge restraints (c'way edge channel)...Lay as Cl.1113AR in 6....Bed on 30-50 of L-MH2 or Cl.1001 with a minimum strength class of CC37 F/way ▼ of surface and laying/...
-
The "Green Book" (Updated 1st May 2024) with Tracked Changes
Adobe Portable Document Format : 1.4MB https://education.southwark.gov.uk/assets/attach/10012/Green-Book-01May24-TRACKED.pdfThe "Green Book" (Updated 1st May 2024) with Tracked Changes...2 months’ half pay During 3rd year of service 4 months’ full pay and 4 months’ half pay...This may be by way of an inclusive rate of pay; locally agreed premium payments, or, by such other...
-
LBS-1100-39 footings for edge restraints (raised lip c'way)
Adobe Portable Document Format : 190KB https://www.southwark.gov.uk/assets/attach/9624/lbs-1100-39-footings-for-edge-restraints-raised-lip-c-way.pdfLBS-1100-39 footings for edge restraints (raised lip c'way)...Footings/beams/haunching shall be either F/way series drawings the paving modules to be used....They must also comply with the B (colour: silver grey) C/way compressive strength class shall be C16/...
-
OKR 3 Mandela Way, OKR 4 Dunton Road Feasibilty Study (June 2020)
Adobe Portable Document Format : 32.5MB https://www.southwark.gov.uk/assets/attach/32803/eip139-okr-3-mandela-way-okr-4-dunton-road-feasibilty-study-june-2020-maccreanor-lavington-.pdfOKR 3 Mandela Way, OKR 4 Dunton Road Feasibilty Study (June 2020)...OKR 3 - Mandela Way OKR 4 - Dunton Road Feasibility Study WORKING DRAFT OPTIONS: 22/06/2020Masterplan...This document is an addendum to the OKR Option 1 - Existing Masterplan layout for OKR3.6 3 (Mandela Way...
-
Shad Thames Consultation Rev B GA (4)
Adobe Portable Document Format : 619KB https://www.southwark.gov.uk/assets/attach/7784/shad-thames-_consultation-rev-b-ga-4-.pdfShad Thames Consultation Rev B GA (4)...STATUS: DRAWN SC CONSULTATION DESIGNED DR SCALE: CHECKED DR 1:250 APPROVED DR DRAWING NO: REV: LBS/18301/GA...
-
Cabinet Report - The way forward Ledbury Estate high rise blocks - Appendix 7 - 30.10.2018
Adobe Portable Document Format : 197KB https://www.southwark.gov.uk/assets/attach/10173/Cabinet-Report-The-way-forward-Ledbury-Estate-high-rise-blocks-Appendix-7-30.10.2018.pdfCabinet Report - The way forward Ledbury Estate high rise blocks - Appendix 7 - 30.10.2018...Variation 1 D Example 2 var 1 D Example 3 var 1) Deomolition BROM & PET - New build New build Fan / Street Lay...
-
Queen's Road area Controlled Parking Zone (notice dated 23 May 2024)
Adobe Portable Document Format : 889KB https://www.southwark.gov.uk/assets/attach/265807/Queen-s-Road-area-Controlled-Parking-Zone-notice-dated-23-May-2024-.pdfQueen's Road area Controlled Parking Zone (notice dated 23 May 2024)...been granted either a valid residents' permit, a valid business permit or a valid visitors' permit may...by Phone') may be left for up to 1 hour (provided no vehicle may return to a parking place on that...
-
Ruskin Walk permanent ‘one-way’ operation (notice dated 25 January 2024)
Adobe Portable Document Format : 673KB https://www.southwark.gov.uk/assets/attach/240268/Ruskin-Walk-permanent-one-way-operation-notice-dated-25-January-2024-.pdfRuskin Walk permanent ‘one-way’ operation (notice dated 25 January 2024)...Public notice Ruskin Walk permanent ‘one-way’ traffic operation The London Borough of Southwark...The effect of the (Prescribed routes) Order would be to implement on a permanent basis:- (a) ‘one-way...
-
SF June 2023 - Item 5 High Needs Action Group Minutes 4 May 2023
Adobe Portable Document Format : 376KB https://www.southwark.gov.uk/assets/attach/190302/sf-june-2023-item-5-high-needs-action-group-minutes-4-5-2023-v3.1.pdfSF June 2023 - Item 5 High Needs Action Group Minutes 4 May 2023...Needs Action Group for content or accuracy High Needs Action Group Draft Minutes th Thursday 4 May... Seek agreement from schools/settings on the way forward....